Monday, August 5, 2019

As a result of sampling procedures applied as tests of controls, an auditor incorrectly assesses control risk higher than appropriate. The most likely explanation for this situation is that:

As a result of sampling procedures applied as tests of controls, an auditor incorrectly assesses control risk higher than appropriate. The most likely explanation for this situation is that:
  • the deviation rate in the auditor's sample is less than the tolerable rate, but the deviation rate in the population exceeds the tolerable rate.
  • the deviation rate in the auditor's sample exceeds the tolerable rate, but the deviation rate in the population is less than the tolerable rate. (correct answer)
  • the deviation rates of both the auditor's sample and the population exceed the tolerable rate.
  • the deviation rates of both the auditor's sample and the population are less than the tolerable rate.
Explanation:

An audit sample is a portion of the total. When a sample is drawn from a population, the items selected may or may not be representative of the population as a whole. “Sampling risk is the risk that the auditor's conclusion based on a sample may be different from the conclusion if the entire population were subjected to the same audit procedure.” (AU-C 530.05) (i.e., control risk may be assessed too high or too low).

If the deviation rate in the sample is higher than the tolerable rate, the auditor may assess a high level of control risk. However, if the deviation rate in the population does not exceed the tolerable rate, the auditor will have assessed the level of control risk for the sample as greater than the true operating effectiveness of the control.

No comments:

Post a Comment