An auditor desired to test credit approval on 10,000 sales invoices processed during the year. The auditor designed a statistical sample that would provide a 1% risk of assessing control risk too low (99% confidence) that not more than 7% of the sales invoices lacked approval. The auditor estimated from previous experience that about 2.5% of the sales invoices lacked approval. A sample of 200 invoices was examined and seven of them were lacking approval. The auditor then determined the achieved upper precision limit to be 8%.
In the evaluation of this sample, the auditor decided to increase the level of the preliminary assessment of control risk because the:
- tolerable rate (7%) was less than the achieved upper precision limit (8%). (correct answer)
- expected deviation rate (7%) was more than the percentage of errors in the sample (3.5%).
- achieved upper precision limit (8%) was more than the percentage of errors in the sample (3.5%).
- expected deviation rate (2.5%) was less than the tolerable rate (7%).
Explanation:
No comments:
Post a Comment