- All inputs are variable in the long run.
- The long run is also known as the planning period.
- Expanding or contracting plant capacity is the type of decision that would be made in the long run.
- The long run would concentrate on cutting costs. (correct)
The long run is a time period where all inputs are variable (i.e., no fixed inputs) and is known as the “planning period,” where the entrepreneur or the firm makes decisions such as whether to enter or exit an industry, whether to expand or contract plant capacity, or whether or not to adopt new technology. Once the firm has made the decision concerning plant capacity, they are then “operating in the short run.”
Cutting costs is much more often a short-run cost of production objective.