Sunday, July 11, 2021

A job-order cost system uses a predetermined factory overhead rate based on expected volume and expected fixed cost. At the end of the year, underapplied overhead might be explained by which of the following situations?

A job-order cost system uses a predetermined factory overhead rate based on expected volume and expected fixed cost. At the end of the year, underapplied overhead might be explained by which of the following situations?



Answer (B) is correct.
If too little fixed overhead is applied at the predetermined rate (expected fixed cost ÷ expected volume), the result is underapplied overhead (actual factory overhead exceeds overhead applied). If the actual and expected fixed costs are the same, but the actual volume is less than the expected (denominator) volume, overhead will be underapplied. If the actual volume equals expected volume but actual fixed costs exceed the expected (numerator) fixed costs, overhead is likewise underapplied.

No comments:

Post a Comment